Highway 84 Corridor Wastewater System Improvements – Phase 2B

This project involves the installation of approximately 4,080 linear feet of gravity wastewater line and 11,600 linear feet of wastewater force main in the Highway 84 corridor. Completion of this force main/gravity line project will allow the Phase 2A lift station project to operate at capacity. This project also allows the Phase 2A project to divert a portion of the Highway 84 wastewater flows to the Bull Hide Wastewater Treatment Plant.

Projected Start/End Dates

Work on this project began in May 2021 and is estimated to be complete by Summer 2022.

Projected Cost

Approximately $4.5 million

Anticipated Impact to Residents

Use of Cotton Belt Trail could be temporarily impacted because of this project.

Primary Core Issue Addressed

Wastewater Master Plan: Asset renewal