Lake Brazos Dam Maintenance

Over time, the flow of the river has begun to erode some of the riverbank that provides a foundation to a portion of the dam. This project involves the repair of the embankment and stabilization of the corresponding portion of the dam. Additionally, the existing outlet works inlet gate will be replaced and disguised with an architectural building that matches other City of Waco public riverfront buildings.

Projected Start/End Dates

Work on this project is scheduled to begin in Spring 2022 and is estimated to be completed in Spring 2023.

Projected Cost

Approximately $5.6 million

Anticipated Impact to Residents

At this time, no disruptions or street closures are anticipated as a result of this project.

Primary Core Issue Addressed

Water Master Plan: Asset renewal